Rachel in protective gear, using a demolition hammer to remove tile

We’ve officially broken ground on the remodel project with floor prep ahead of a glue-down installation of engineered hardwood, which we will be responsible for half the house (contractors are tackling the other half).

The floor is smooth and free of glue and mortar where tile and carpet once lived. Bonus dog for internet points.

Main hallway free of tile with Chuck, the dog, looking at the camera while laying on the ground Main bedroom with work area set up