70F. Clear. Final front wall segment assembled and raised.

70F. Sunny & Windy. Riser installed on front walls. Construction paused until the neighborhood board approves of construction which may result in conceding a lower slope roof (metal instead of …
70F. Clear. Final front wall segment assembled and raised.

65F. Clear. Front wall segment assembled and raised.

Progress paused due to neighborhood board interference.
Missing material pickup.
65F. Sunny. Side walls & windows framed and lifted into place.
Bones got bored and hot and dug himself a dirt hole to keep cool.

60F. Sunny. Rear walls raised into place. Thank you @milsyobtaf & @drewcastillo for the assist. Right wall frame begun. Header materials still missing from incorrect Lowe’s order.

55F. Sunny. Rear wall segments framed. Awaiting raising.

Day 16/17
No progress made. Uncovered materials & structure to dry out.
27F. Snowy. Weather delays.